IDM-NT202EM Multiservice access equipment User Manual
IDM-NT202EM Multiservice access equipment
User Manual
Beijing Raytrans Digital Technology CO., LTD
To the user
(1) Thank you for using our equipment. Our equipment is used in design has a good and reliable performance, but still should avoid man-made damage to the equipment. Before using this product, please read this user manual carefully, and properly kept, for reference.
(2) Before installing this product, please check the model, and installed according to the requirements of user manual
(3) Please keep away from raining and damping, in order to avoid damage.
(4) Don't put anything on the power cable, the cable tie or encase. To avoid fire, should be kept where it is not easy to meet.
(5) The power adapter and other equipment shall be connected to each other tightly fitting, please check.
(6) Please note that the equipment clean, if necessary, can use soft cotton cloth to wipe
(7) Please note that don't block ventilation cooling hole
(8) Please don't repair equipment, except there are clear instructions in the manual. When the equipment running abnormal please power off immediately and contact the company's after-sales service.
(9) Our company provides three months replacement to our products, one year free warranty, life-long maintenance services.
Free maintenance service related matters are as follows:
In one year warranty, if used properly and according to the instruction manual and failure occurs under normal use, the company will be responsible for free maintenance; Every open the equipment itself, the company will not be responsible for maintenance; More than warranty period of equipment, our company is responsible for maintenance, appropriate fees.
(10) Caused by the product itself quality problem during the warranty period of the equipment cannot run normally use, the company responsible for replacement, recycling products owned by the company
(11) Man-made damage to the equipment damage, or not in accordance with the manual operation of equipment damage, our company is not responsible.
1. Function description:
1. Support 1 channel 100M Ethernet
2. Support 2 channels EM interface
2. Illustration of panel indicator and dial switch
3. Dial Switch implication:
Dial switch |
Condition implication |
|
|
ON |
OFF |
SW1 |
Master clock |
Slave clock |
SW2 |
2 Wire |
4 Wire |
SW3 |
When sw3=OFF, SW4=OFF, “0”DB sends “0” DB receives; When sw3=OFF, sw4=ON, “0”DB sends “-3.5” DB receives; |
|
SW4 |
4. Panel indicator implication:
Indicator |
Color |
Condition |
Function description |
EM1 |
yellow |
Light/OFF |
First channel E signaling indicator |
EM1 |
green |
Light/OFF |
First channel M signaling indicator |
EM2 |
yellow |
Light/OFF |
Second channel E signaling indicator |
EM2 |
green |
Light/OFF |
Second channel M signaling indicator |
ETH |
yellow |
Light/OFF |
Ethernet connection indicator, When the Ethernet get through, it lights. |
ETH |
Green |
Light/OFF |
Ethernet rate indicator, light: 100M OFF: 10M |
PWR |
Green |
Light |
Power indicator, When the power is normal, it will light |
FIBER |
Yellow |
Light/OFF |
Optical interface alarm indicator Light: optical interface alarm; OFF: without optical interface |
5. Business line definition
EM2/4 Wire card 2 Wire RJ45 (8P8C) The reference of conversion signal pin
RJ45 |
|
Signal name |
Remark |
1 (D) |
MB Wire |
EM signaling output |
|
2 (H) |
MA Wire |
EM signaling output |
|
3 (A) |
IN/out |
Audio wire input |
|
4 (B) |
IN/out |
Audio wire output |
|
5 (E) |
|
|
|
6 (F) |
|
|
|
7 (G) |
EA Wire |
EM signaling input |
|
8 (c) |
EB Wire |
EM signaling input |
|
EM2/4 Wire card 4 Wire RJ45 (8P8C) The reference of conversion signal pin
RJ45 |
|
Signal name |
Remark |
1 (D) |
MB Wire |
EM signaling output |
EA wire, EB wire connect 5V power, MB wire and MA wire get through |
2 (H) |
MA Wire |
EM signaling output |
|
3 (A) |
IN |
Audio wire input |
|
4 (B) |
Out |
Audio wire output |
|
5 (E) |
|||
6 (F) |
IN |
Audio wire input |
|
7 (G) |
EA Wire |
EM signaling input |
Connect +5V |
8 (c) |
EB Wire |
EM signaling input |
Connect GND |
6. EM signaling testing method
Remote sending: when EA wire access the power +5V, EB wire connect GND.
Central equipment’ s MA wire and MB wire connect through, the power is 0.
Central sending: when EA wire connect power +5V, EB wire connect GND
Remote equipment’ s MA wire and MB wire connect through, the power is 0.